Shadow
Shadow
 
Home arrow Level crossing
System core
Computer-controlled signalling systems

Reliable basis for flexible applications

The systems supplier Scheidt & Bachmann is able to look back on a 125-year tradition in the construction of railway signalling systems. After the turn of the century mechanical installations controlled the first level crossings. The experience in several generations of relais systems was the basic to start the development of a computer-controlled system called BUES 2000. The new developed interlocking system ZSB 2000 makes Scheidt & Bachmann together with the level cross technology to a full supplier for signalling system.

We offer integrated solutions to your advantage,

comprising:

  • standard hardware configuration
  • standard service concept
  • automatic operating system
  • central system control and monitoring

... since we take the overall responsibility for a safe system.

Software Structure:

The structure guarantees maximum safety without loosing flexibility when the system is upgraded with new functions.

 

© 2008 Scheidt & Bachmann GmbH
Shadow
Shadow
 
Shadow
Shadow